Artículo: AMZ-B0B9QMJH4X

Methodology for manufacturing of Harbour structures (Volume III): Marine Construction Works

Format:

Hardcover

Hardcover

Kindle

Paperback

Detalles del producto
Disponibilidad
En stock
Peso con empaque
1.29 kg
Devolución
Condición
Nuevo
Producto de
Amazon
Viaja desde
USA

Sobre este producto
  • The purpose of this book is to present step-by-step requirements and methodology for the fabrication of port and marine structures with details to build high quality vertical breakwaters (caissons) in accordance with project specifications, applicable codes and standards. In this third part (Volume III); We started with Directive and Recommendations for marine construction works. Then we presented with details how to do and apply the Methods of Construction of Vertical Breakwaters (Caissons), such as; Construction on Floating Dock, the JARLAN Caisson and Protection Vertical Dykes. After, we present with details how to make and apply the Slip form Construction, such as; Installation of gantry house and sliding formwork systems For the production of caissons, and Methodology of manufacture of the caisson (vertical Breakwaters) by Slip form. Then we presented with details how to do and apply the methods of repairing the caissons. Finally; we present with details how to make and apply the Methodologies of realization of the main elements and works of a port.
$128,61
9% OFF
$116,71

IMPORT EASILY

By purchasing this product you can deduct VAT with your RUT number

APPLIES FRANCHISE

$128,61
9% OFF
$116,71
Envío gratis
Llega en 5 a 12 días hábiles
Con envío
Tienes garantia de entrega
Este producto viaja de USA a tus manos en